Tuesday, 25 August 2015
Home »
News Metro
» GOVT COMMENCES ASSESSMENT OF EXISTING WATER SCHEME
GOVT COMMENCES ASSESSMENT OF EXISTING WATER SCHEME
DELTA State Government has commenced on-the-spot assessment of existing water schemes across the state with a view to rehabilitating them and make water available to Deltans.
The Commissioner for Water Resources, Mr. Fidelis Tilije, led a team of various agencies under his ministry in company of the Commissioner for Housing, Arc. Joseph Ogeh, to visit the various water schemes in Isoko North and part of Isoko South local government areas to ascertain their functionality.
The first ports of call were the solar-powered water schemes at Ofagbe and Okpe-Isoko communities both rehabilitated by Delta State Oil Producing Areas Development Commission (DESOPADEC) in 2012 and 2013 respectively and still functional, where. Tilije however, expressed surprise that the facility at Ofagbe was still under lock and key at 11 am when the team arrived and advised that it should be made accessible to the people early enough.
The water scheme at Emede, which functions on both motorized and solar was also rehabilitated by DESOPADEC. At the time the team visited, the scheme was not functioning due to faulty pump. However, representative of the contracting firm (EXIMIOUS Concept), who was on ground said he only got the information that the scheme was not working three days before the commissioners’ visit.
Whereas, the water facilities at Ogewho-Iyede and Okpaige-Iyede were found to be functional, the one at Igbide was not working. According to the people of the community, the scheme stopped functioning over five years ago. The Niger Delta Development Commission (NDDC) was said to have rehabilitated the storage tanks but the scheme never worked because the pipes were not linked, they said.
Otor-Owhe and Ozoro water schemes both powered by motorize pumps were also visited and found to be non-functional due to challenges, ranging from weak and old Abestos Cement (AC) pipes, bad pumps, starter panel, unconnected pumps, uninstalled generating sets, power supply issues and leaking roof of the office building.
The Zonal Manager, Urban Water Board, Engr. Leonard Okporkpor, who conducted the commissioner round the various schemes in the zone, noted that due to development, population increase and presence of the Polytechnic, there was need for pipe replacement, inter-connections to streets and extension to newly developing areas.
The Pointer
Related Posts:
Ohanaeze, South-East Govs’ meeting with pro-Biafra protesters postponed The expected meeting of the governors of the South-East states, the leadership of Ohanaeze and other stakeholders initially slated for this weekend in Owerri, at the instance of Governor Rochas Okorocha to discuss the cont… Read More
Guinness Nigeria Announces New Directors Guinness Nigeria Plc has announced the appointment of Mr. Emmanuel Egerton-Shyngle as national retail sales director, and Ms. Anne Maingi as commercial effectiveness director. The company in a release noted that both appoin… Read More
See full list of Buhari’s ministers and their portfolios Barely six months after coming to power, President Muhammadu Buhari on Wednesday, finally assigned portfolios to his ministers-designates at the Ministerial Inauguration that took place at the Presidential Villa.The full li… Read More
CBN Makes U-Turn Over BVN Registration Deadline, Offers New Lifeline To Account Holders The Central Bank of Nigeria (CBN) has offered a lifeline to bank account holders over the deadline given to account holders over the registration of the Bank Verification Number (BVN). According to The Nation, a statem… Read More
Buhari swears in Ministers ABUJA–President Muhammadu Buhari, on Wednesday, performed the inauguration ceremony of his ministers-designates in Abuja.He also assigned portfolios to all the 36 Ministers.This is contrary to the speculations that there wo… Read More
0 comments:
Post a Comment